Recording of second event (Friday 1 August, 1pm)
Click for first event

All the questions have been timestamped.  If you scroll through and click each question, you will start the recording of the video at the appropriate position. You can turn on the auto-generated captions (subtitles) by hovering over the video and pressing the CC button in the bottom right corner.

Here are the consultation slides used in the presentation: Consultation slides (warning opens a large file PDF)

  1. Start
  2. Introduction of panel members
  3. Architects presentation
  4. Question on relationship with other nearby sites
  5. Question on location of water for firefighting
  6. Question on storing spent firefighting water
  7. Question on battery lifespan and recycling
  8. Question on need for EIA
  9. Question on flooding issue and drainage
  10. Question on site choice
  11. Question on transporting batteries to site
  12. Question on submission and meeting with Parish
  13. Question on potential for extending site
  14. Question on height of mature trees
  15. Question on volume and capacity of tanks
  16. Question on need for solvents within water
  17. Question on potential danger and location of site
  18. Question on need for a BESS in this area
  19. Question on Parish meeting
  20. Question on water's ability to put out fires
  21. Questions on site selection reasons
  22. Question on access for emergency vehicles
  23. Question on the 'green' nature of the application
  24. Question on need for cabling application
  25. Question on road closure
  26. Question on potential loss of agricultural land
  27. Concluding remarks and how to provide feedback
  28. End